Construction Method

  • 1. Construction of foundation floor Foam concrete and Styrofoam are applied to the base slab floor.
  • 2. Installation of insulation Cut and install 5mm thick insulation recommended by us
  • 3. Installation of NANO HEAT carbon heater Arrange with 100mm spacing and leave 100mm from the wall
  • 4. Installation of floor-only mesh Arrange and install floor-only mesh recommended by us (optional)
  • 5-1. Mortar work plaster and dry and re-dry for three days using heating
  • 5-2. Tile construction plaster and dry and re-dry for three days using heating
  • 6. Construction of finishing materials After finishing the drying process, construct finishing materials including marbles and tiles
  • 7. Installation of regulator
  • 8. Construction completes
  • 1. 와이어 스트리퍼를 이용하여 피복제거 와이어스트리퍼를 이용하여 전선의 끝부분과 나노히트의 끝부분의 피복을 벗긴다.
  • 2. 슬리브와 압착기 연결 슬리브와 압착기를 이용하여 전선과 NANOHEAT를 연결한다.
  • 3. 전기테이프 전기테이프를 이용하여 이어진 부분을 감싼다.
  • 4. 가스토치와 수축튜브 가스토치와 수축튜브를 이용하여 이어진 부분을 작업한다.
  • 5. 전기테이프 전기테이프를 이용하여 이어진 부분을 감싼다.
  • 6. 마감 수축튜브와 팬치를 이용하여 마감을 한다..